Costa Palmas

Rancho San Lucas Customer Will Bennett Location La Ribera, México Category Development Development area 372 Ha’s (919 acres) Activities • Platforms • Channeling of streams • Dredging in Marina • Earthworks • Pavements • Hydrosanitary installations • Pluvial installations Year of completion In Progress Other Projects Amanvari Costa Palmas Bordo

Leer más

Bordo La Ribera

Bordo La Ribera Location La Ribera, B.C.S. Activities Earthwork Excavation and backfilling for denticles Year ended 2024 Other Projects Amanvari Costa Palmas Contact Contact

Leer más

Diamante

Rancho San Lucas Costumer Gregory Carrafiello, Ken Jowdy Location Cabo San Lucas Category Development Development area 535 Ha’s (1,322 acres) Year of completion In Progress Activities • Engineering Design for Installations • Earthworks • Earthwork on Golf Courses • Containment Walls • Gabion Walls • Hydraulic Installations • Sanitary Drain

Leer más

Rancho San Lucas

Rancho San Lucas Costumer Sergio Adler / Jorge López Lepe Location Cabo San Lucas Category Development Development area 337 Ha’s (834 acres) Activities • Earthworks • Earthworks in Golf Courses • Soil-cement backfills • Storm Sewers • Roadway Earthworks • Lake Excavations • Sand Movement • Platform Formation Year of

Leer más

Palmilla Park and Hills

Palmilla Park and Hills Location San José del Cabo Category Development Activities • Engineering: Topography Geometric design of roads Hydrosanitary Design Pluvial Design Electrical Design • Work: Earthworks Drinking Water Network Sanitary Drainage Network Pluvial Drainage Medium Voltage Electrical Network Paving Year of completion In Progress Other Projects Amanvari Costa

Leer más

Querencia

Querencia Costumer Jorge Carrera Location San José del Cabo Category Development Development area 132 Ha’s (326 acres) Actividades • Gabion Walls • Mechanical Retaining Walls • Tunnel Under Trans-Peninsular Highways Design and Construction • Hydraulic Installations • Sanitary Drainage Lines • Pluvial Drainage Systems • Cart Paths Year of completion

Leer más

Chileno Bay

SEDATU Costumers Gonzalo Franyutti Víctor Cortés Daniel Urrea Allan Tricon Location Cabo San Lucas Category Devolpment Development area 480 Ha’s (1,186 acres) Activities • Engineering Design for Installations • Earthworks • Golf Course Earthworks • Retaining walls • Pavements • Gabion walls • Hydraulic Installations • Sanitary Drainage Lines •

Leer más